Testing in the Age of the Coronavirus
With a nationwide lockdown put in place during the set up, a recent blast test was a challenge for all concerned. After months of planning, we managed to complete the testing of some high performance concrete façade panels for Fibrobeton of Turkey. With all personnel working within the constraints of social distancing, the local hotel shutting down on us, the customer and visitors prevented from attending, there were more challenges than usual. Working with both DNVGL and OTS Ltd we prevailed, completed the test and captured the data.